Our clients are named further down this page. The work itself is under confidentiality, so the engagements here are described at sector level and none of them is matched to a name. What we will not do is dress up a generic description with invented numbers: where a figure appears anywhere on this site, it is one we can defend.

Universal credit organisation

Physical + Network

Situation

A financial services business moving into a new multi-floor office, with a regulator-driven requirement that card-handling systems be demonstrably separated from the corporate network.

Constraint

The fit-out schedule was fixed by the lease, and segmentation had to be designed before any cable was pulled. Retrofitting separation into a flat network after occupancy is substantially more expensive.

Approach

  • Survey and pathway design before the walls were closed
  • Cat6A horizontal distribution with fibre backbone between floors
  • Separate physical paths and clearly distinct labelling for regulated systems
  • Segmented network design delivered as part of the same scope, not handed to a second vendor
  • Certified per-port test results and as-built documentation at handover

Evidence produced

Full port-level test results, floor plans and cable schedules supplied as the audit evidence pack.

Media holding

Physical + Platform

Situation

A production operation where editing throughput had become the bottleneck, with staff moving large media files across a network originally specified for office use.

Constraint

Production could not stop. Any change had to be staged around active editorial deadlines, with a rollback path at each step.

Approach

  • Measured actual throughput and contention before proposing anything
  • Fibre backbone and storage-network redesign sized against real file sizes, not nominal specification
  • Phased switchover executed outside production hours
  • Storage tiering so archive material stopped competing with active projects
  • Documentation handed over so the in-house team could operate it

Evidence produced

Before-and-after throughput measurements on the same test transfer, recorded in the handover pack.

Licensed betting operator

Platform + Engineer

Situation

An international operator whose platform team was blocked behind infrastructure work, with deployments infrequent, manual and consequently high-risk.

Constraint

Traffic peaks around events meant capacity could not simply be reduced, and licensing obligations required a technical audit trail of changes.

Approach

  • Kubernetes platform with autoscaling matched to event-driven peaks
  • Infrastructure defined as code so environments became reproducible and reviewable
  • CI/CD pipelines with an auditable record of every production change
  • SAST and dependency scanning integrated at thresholds the team would keep
  • Golden paths so product teams could deploy without infrastructure tickets

Evidence produced

Change records generated automatically by the pipeline, usable directly as licensing audit evidence.

Healthcare provider

Operate + Assure

Situation

A provider with a disaster recovery plan that had been written, filed, and never executed: a common and unmeasured risk.

Constraint

Clinical systems could not be taken offline for a test, so recovery had to be proven without disrupting care.

Approach

  • Business impact analysis to set recovery objectives against clinical rather than commercial impact
  • RTO and RPO agreed per system with clinical leadership
  • Recovery exercises run against isolated restored copies rather than live systems
  • Runbooks rewritten to be executable by someone who did not author them
  • Findings from each exercise remediated and re-tested

Evidence produced

Dated recovery test records with measured restore times, retained as audit evidence.

Our own installations

STP's long-standing claim is that its installations are finished to a standard a customer would be glad to show a visitor. That is either true or it is not, and photographs are the only honest way to settle it. These are our own sites.

Before and after

The same room, rebuilt.

Two photographs of one site, taken from the same spot before the work started and after it finished. The floor is the same floor. This is the kind of evidence the rest of this page argues for, so it is here rather than described.

A rack before the rebuild: patch cords of several colours looped loosely across the equipment and spilling onto the floor, with no cable management in use
Before
The same rack after the rebuild: the equipment remounted on a new frame, patch cords combed into rows by colour, and the UPS seated at the foot
After

Who we have worked for

Organisations that trusted us with it.

Every mark belongs to its owner. This is not a partner programme and not an endorsement; it is a list of who the work was done for.

Partners

Banking and finance

Healthcare

  • Davidyants Laboratories
  • Davidyants Clinics
  • Margaryan Maternity Hospital
  • Histogen
  • Alfa Pharm

Hospitality and travel

  • Ani Plaza Hotel
  • Ani Grand Hotel
  • Ani Central Inn
  • Radisson Hotel & Spa Gyumri
  • Yerevan Park
  • Unique Travel and Tours

Industry and construction

  • GeoProMining Gold
  • Dorproject Institute
  • Anitex Textile Factory
  • Kaskad Energo Progress
  • Yeranos Armenian Premium Spirits
  • Best Group (Lideria)
  • Patron
  • Profal

Technology

  • Podcastle
  • Sperasoft
  • Axellect
  • QLess Armenia
  • Status Holding
  • Digitain

Media and entertainment

  • 168.am
  • Bet Production
  • Red Feather

A note on proof

Why no logo sits beside an engagement.

The organisations above agreed to be named as clients. None of them agreed to be matched to a particular piece of work, and that distinction decides how this page is written.

They are banks, credit organisations, healthcare providers and licensed operators. Naming a client is a reference. Publishing which infrastructure supplier holds privileged access to which regulated institution is a different thing entirely, and not a marketing decision we get to make unilaterally.

So the engagements above are described at sector level, and nothing here connects one of them to a name. We would also rather be judged on the engineering than on a wall of marks: a port-level test result, a dated recovery-test record or an as-built cable schedule shows the work was done properly, and those are the things we can put in front of you in a meeting.

If you want a reference, ask. We will approach clients whose situation resembles yours and see who is willing to speak to you directly. That is worth more than any logo, including the ones above.

Ask us about the engagement closest to yours.

We can go into real technical detail about how a problem like yours was solved without naming anyone.